Leonsand Fitouts managed our commercial fitout from start to finish and made the entire process straightforward. Communication was clear, timelines were met, and the final space was delivered exactly as promised. Having one team responsible for both design and construction made a noticeable difference.
The duration of the project can vary significantly based on several key factors, including the size of the project, the complexity of the design, the level of customisation required, and the current state of the office space.
Here’s a general timeline:
- Consultation and Design (2-4 weeks): This initial stage involves meetings with designers and builders to discuss your needs, preferences, and budget. The team will then develop a concept and detailed plans.
- Approval and Permits (1-6 weeks): Depending on the scope of the project and local regulations, you may need to obtain various permits. The time frame can vary based on the complexity of the project and the efficiency of the local authorities.
- Construction and Installation (4-12 weeks): This is the most variable part of the timeline, depending on what this project entails. Simple projects in small offices can be completed more quickly, while extensive renovations in larger spaces will take longer.
- Finishing Touches and Clean-Up (1-2 weeks): The final stage includes installing furniture, equipment, and finishing touches like painting and decorating, followed by a thorough clean-up.